Blog
Nov 16, 2026
Field notes: the quarter the startup date moved and the dashboard didn'tWhy a contractor's weighted-progress curve can stay green for months after the ground tells a different story, and what to watch instead.
Nov 16, 2026
What is a schedule recovery plan, and when does an EPC have to file one?What an EPC schedule recovery plan is, when the contract requires one, and how it relates to critical path slippage and the LD trigger date.
Nov 9, 2026
Foundation work vs. steel erection: how to read refinery construction stages in imageryA field guide to telling civil/foundation work apart from structural steel erection in refinery and LNG construction imagery, stage by stage.
Nov 9, 2026
LNG tank hydrotest: what it is and why it signals mechanical completionWhat an LNG tank hydrotest involves, and why the scaffold-strike and crane shift around it is one of the last visible mechanical completion signals.
Nov 2, 2026
Field notes: the tank farm that filled with water before anyone said a wordA floating roof tank filling with water weeks before any startup announcement. What the hydrotest signal tells you and why it shows up on imagery first.
Nov 2, 2026
What hook-up and commissioning is, and why a structure-growth read won't show itHUC starts after the steel stops rising. Here's what mechanical completion vs. commissioning means, and what a monthly structure-growth read can't catch.
Oct 26, 2026
How to tell an LNG tank under construction from a finished one in satellite imageryWhat a cryogenic LNG tank looks like at each build stage in VHR imagery, from foundation ring to dome lift to finished insulated shell.
Oct 26, 2026
What is a pre-startup safety review, and why it can push back an LNG startup dateA plain look at the PSSR step between mechanical completion and startup, and why it's the point where LNG and refinery schedules quietly slip.
Oct 19, 2026
Field notes: the flare stack that lit three weeks before anyone announced startupA flare stack lit three weeks before a startup announcement is a classic tell. Here's why it's not enough on its own, and what fills the gap.
Oct 19, 2026
Turnaround vs. new-unit startup: two different clocks in refinery schedulingWhat separates a refinery turnaround from a new-unit startup, and what "startup date" actually means in each case for traders, lenders and EPCs.
Oct 14, 2026
How to tell pipe rack steel from piping installation in satellite imageryPipe rack bents look finished from above long before a single line is run. Here's how to read steel versus piping in VHR imagery.
Oct 14, 2026
What is float in an EPC construction schedule, and why lenders track itA plain-language guide to float in an EPC schedule, how it differs from contingency, and why lenders watch float burn as a schedule-risk signal.
Oct 13, 2026
How to spot the gap between reported percent complete and the siteWhy EPC percent-complete curves and physical site progress drift apart, and what to check before you trust the next monthly report.
Oct 13, 2026
How to tell a refinery unit in commissioning from one still under constructionHow to read overhead imagery to tell commissioning-stage units from ones still under construction, and spot real startup readiness signs.
Oct 7, 2026
FID to first cargo: how long an LNG train actually takes to buildWhat actually happens between final investment decision and first cargo on an LNG train, and why the published schedule rarely matches the site.
Oct 7, 2026
Module yard assembly vs. stick-built construction: telling them apart in satellite imageryHow to read module yard assembly vs stick-built construction in VHR satellite imagery, and why the distinction matters for schedule risk.
Oct 7, 2026
What is a liquidated damages clock on an EPC contract?How the LD clock works on refinery and LNG EPC contracts, what sets the trigger date, and why the start date matters more than people think.
Oct 7, 2026
What is mechanical completion in an EPC project?A plain explanation of mechanical completion in EPC contracts, how it differs from commissioning, and where it sits among the milestones toward startup.